Peugeot 405

1987-1997 of release

Repair and operation of the car



Peugeot 405
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 4. Fuel system
+ 5. Lubrication systems, coolings
+ 6. System of release
+ 7. Coupling
+ 8. Transmissions
- 9. Power shafts
   9.1. Technical characteristic
   9.2. Removal of power shafts
   9.3. Installation of a power shaft
   9.4. Replacement of covers of hinges of equal angular speeds
   9.5. Replacement of the intermediate bearing of the right power shaft
   9.6. The drive on forward wheels with the power unit 4 x 4
   9.7. The drive on back wheels with the power unit 4 x 4
+ 10. Steering
+ 11. Suspension brackets
+ 12. Brake system
+ 13. Body
+ 14. Electric equipment


e1bd1949



9.7. The drive on back wheels with the power unit 4 x 4

GENERAL INFORMATION

Actions for removal and installation of the driving bridge are not labor-consuming. It is necessary to observe the tightening moments.

Removal and installation of a power shaft

PERFORMANCE ORDER
1. To lift the relevant party of the car and to merge oil from the bridge.
2. To remove a wheel, to take the forelock and the protection cover of a nut of a power shaft.
3. By means of the lever to record a nave and to weaken a nut of a power shaft.
4. To unscrew a nut of a power shaft.
5. To unscrew bolts of fastening of the case of the bearing (are specified by shooters) from the inside of the lever.
6. To remove a nave from a power shaft.
7. Installation consists in performance of actions in the return sequence in relation to removal process, and at first it is necessary to replace a sealing ring of a power shaft in a case of the driving bridge. The last operation is filling of oil to the bridge.

On the homepage