Peugeot 405

1987-1997 of release

Repair and operation of the car



Peugeot 405
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
- 4. Fuel system
   - 4.1. Fuel system with the carburetor
      4.1.1. Fuel pump
      4.1.2. The fuel level sensor in a tank
      4.1.3. Fuel tank
      4.1.4. Removal and installation of the carburetor
      4.1.5. Dismantling of the carburetor
      4.1.6. Operation of the carburetor
      4.1.7. Adjustment of the carburetor
      4.1.8. OVAD starting arrangement
      4.1.9. Subsequent cooling of the engine
      4.1.10. Inlet collector
      4.1.11. Final collector
   + 4.2. Single-point systems of injection of fuel
   + 4.3. Multipoint systems of injection of fuel
+ 5. Lubrication systems, coolings
+ 6. System of release
+ 7. Coupling
+ 8. Transmissions
+ 9. Power shafts
+ 10. Steering
+ 11. Suspension brackets
+ 12. Brake system
+ 13. Body
+ 14. Electric equipment


e1bd1949



4.1.11. Final collector

GENERAL INFORMATION

Arrangement of laying on final canals on a head of the block of cylinders


Removal

PERFORMANCE ORDER
1. To disconnect a hose of supply of hot air in an engine power supply system from a final collector.
2. To unscrew screws and to remove a casing from the top part of a final collector.
3. To unscrew nuts of fastening of a reception exhaust pipe to a final collector, then to unscrew the bolt fixing a reception exhaust pipe to an installation suspension bracket. To disconnect a reception exhaust pipe from a collector and to remove laying.
4. In the presence to weaken nuts and to exempt the amplifier of steering and a pipe of the cooling system from suspension brackets.
5. To unscrew nuts of fastening of a final collector to a head, to remove a collector and laying.

Installation on the former place

PERFORMANCE ORDER
Installation is made in the sequence, the return to removal, taking into account the next moments:
      – to check racks of a final collector for wear and corrosion;
      – to check that the interfaced surfaces of a collector and a head pure and dry. To establish new laying of a collector and the collector and to tighten fastening nuts the required moment;
      – to connect a reception exhaust pipe to a final collector.