|
Peugeot 4051987-1997 of releaseRepair and operation of the car |
|
Peugeot 405 + 1. Maintenance instruction + 2. Maintenance - 3. Engines + 3.1. Petrol engines - 3.2. Diesel engines 3.2.1. Technical characteristic + 3.2.2. Adjustments of the engine 3.2.3. Removal and installation of the fuel pump of high pressure 3.2.4. Installation of the fuel pump of high pressure BOSCH 3.2.5. Installation of the fuel pump of high pressure Roto Diesel 3.2.6. Removal of water from the fuel filter 3.2.7. Removal of air from fuel system 3.2.8. Removal and installation of a nozzle 3.2.9. Check electrically the operated engine stop valve 3.2.10. Adjustment of the pump Bosch 3.2.11. Adjustment of the pump Roto Diesel 3.2.12. Removal and installation of a turbocompressor + 3.2.13. The repair which is not demanding removal of the engine 3.2.14. Removal of the engine 3.2.15. Installation of the engine 3.2.16. Dismantling of the engine 3.2.17. Assembly of the engine 3.2.18. Oil pump + 3.2.19. Cooling system 3.2.20. System of production of exhaust gases + 3.3. Petrol engine 1,4 of dm3 + 3.4. System of ignition + 4. Fuel system + 5. Lubrication systems, coolings + 6. System of release + 7. Coupling + 8. Transmissions + 9. Power shafts + 10. Steering + 11. Suspension brackets + 12. Brake system + 13. Body + 14. Electric equipment |
3.2.12. Removal and installation of a turbocompressor
Removal of a turbocompressor (first stage)
Removal of a turbocompressor (second stage)
Removal of a turbocompressor (last stage)
Placement of wooden whetstone for fixing of the engine Removal
Installation For installation of a turbocompressor it is necessary to perform operations in the return sequence in relation to its removal, and it is necessary to observe the following instructions.
|
On the homepage |